Grade of copper tube: C1100,T2,ETP,C1220,TRP,DHP
Material for insulation layer : PVC or rubber
OD of insulation pipe:22.35mm-35mm
OD of copper pipe:6.35mm-19.05mm
WT of insulation pipe:0.89mm-2.11mm
WT of copper pipe:8mm-13mm
Introduction :
Oil pipe line is made of pipe equipped with oil pump and other mounting Accessories in order to complete the oil unloading and transportation task.
Insulation Copper tube coil has advantage of good corrosion resistance and anti-frame which improve the safety of oil pipe line
Specifications of Insulation Copper Pipe Coil for Oil Pipe:
1) Grade: C1100 C1020 C1220
2) OD: OD: 22.35-35mm (1/4"-7/8")
3) Length: 10-30mtrs
4) Temper:O 1/4H 1/2H H
5) Elongation:>15%
Features of Insulation Copper Pipe Coil:
OD of insulation pipe:22.35mm-35mm
OD of copper pipe:6.35mm-19.05mm
WT of insulation pipe:0.89mm-2.11mm
WT of copper pipe:8mm-13mm
Grade : C1100,T2,ETP,C1220,TRP,DHP
Chemical composition: c1100 Cu>99.90 C1220 Cu>99.90 P :0.015-0.040
Temper: drawn or annealed
Feature of insulation copper pipe coil:
1.Frost resistance
2.Anti-frame
3.Good elongation
4.High safety factor
Nature of Heat Insulator:
Normal Specifications of Single Pipe Coil:
1) Customized Pipe is also available.(Max. length 50mtrs)
2) The size of the outer diameter and the thickness can be customized with special orders.
Normal Specifications of Paired Pipe Coil:
Packaging of Insulation Copper Pipe Coil:
Shanghai Metal Products are packed and labeled according to the regulations and customer's requests. Great care is taken to avoid any damage which might be caused during storage or transportation. In addition, clear labels are tagged on the outside of the packages for easy identification of the product I. D. and quality information.
1)Shanghai Metal Standard
2)Customization
Applications of Insulation Copper Pipe Coil:
1. Cold and hot water supply systems for civil and industrial constructions:
1) residential buildings
2) hospitals
3) hotels
4) school
5) office buildings
6) ship building
2. Drinking water systems and food industry pipe works
3. Transportation of liquefied petroleum gas
4. Subterranean natural gas
5. Coal gas
We will contact with you within 8 hours